Sign In | Join Free | My infospaceinc.com
China Ningbo Anyo Import & Export Co., Ltd. logo
Ningbo Anyo Import & Export Co., Ltd.
Your best electronic components sourcing and vendor consolidation facilitator
Site Member

9 Years

Home > Passive Electronic Components >

Metal-glazed 3*3mm chip trimmer potentiometer with same performance as original TMC3KJ EVM3G

Ningbo Anyo Import & Export Co., Ltd.
Contact Now

Metal-glazed 3*3mm chip trimmer potentiometer with same performance as original TMC3KJ EVM3G

  • 1
  • 2
  • 3

Brand Name : ANYO

Model Number : 303-1

MOQ : 10000PCS

Price : USD0.026~0.05/PC

Supply Ability : 1000000PCS PER DAY

Packaging Details : 2500PCS/ROLL

Norminal total resistance : 100-1MΩ

Resistance tolerance : ±25%

Contact resistance variation : 5%

Withstand voltage : 50V

Effective electrical travel : 240±20°

Rated wattage : 0.15W

Operating temperature range : -40~+100℃

TCR temperature coefficient resistance : ±250ppm/℃

Rotational life : 200 circles

Total mechanical rotation angle : 270±20°

Rotational torque : 1~12 mN*m

End stop strength : ≥15 mN*m

Contact Now

FEATURES:
• Space Saving Size 1.3mm in height

• With stopper
• Easily adjusts with standard screwdriver.
• Metal-glaze resistance element gives excellent stability and protection against environmental factors.
• Can be mounted to a circuit board with adhesive.
• Designed for reflow soldering.
• Supplied in 8mm tape for automatic assembly equipment.
• Conform RoHS
• APPLICATIONS : Video equipment, industrial equipment and other general electronic equipment.

SPECIFICATIONS:

Operating Temperature Range -40 to 100℃
Rated Power 0.15W at 70℃
Maximum Rated Voltage AC50V, DC50V
Nominal Total Resistance 100Ω, 200Ω, 500Ω, 1kΩ, 2kΩ, 5kΩ, 10kΩ, 20kΩ, 50kΩ, 100kΩ, 200kΩ, 500kΩ, 1MΩ
Total Resistance Tolerance Within ±25% of the nominal total resistance
Resistance Taper B(Linner Taper :JIS 0B)
Resistance Temperature Coefficient Within ±250ppm/℃
Total Rotational Angle Endless(effective rotational angle 250±20°)
Rotational Torque 1 to 12mN・m
Endurance(Sliding) 20cycles(10cycles at 100Ω)
Weight at 1 pcs 40mg

APPLICATIONS:

CAMERA built-in VCR, 8mm VCR, VCR camera, still camera, headphone stereos, LCD television, disk drive, bar code equipment, radar detectors, hand held equipments.

REFLOW SOLDERING REQUIREMENTS:

• Manual Soldering: In case of soldering by a soldering iron, it shall be finished within 3 seconds and the temperature of the tip of the soldering iron shall be 350℃ max.

• Flux Rinsing: After reflow soldering operation, part may be used without rinsing, if flux is well controlled. In case flux rinsing is done, flux shall be removed sufficiently.

External dimensions:

Metal-glazed 3*3mm chip trimmer potentiometer with same performance as original TMC3KJ EVM3G

Metal-glazed 3*3mm chip trimmer potentiometer with same performance as original TMC3KJ EVM3G

Packing specification:

Metal-glazed 3*3mm chip trimmer potentiometer with same performance as original TMC3KJ EVM3G

Metal-glazed 3*3mm chip trimmer potentiometer with same performance as original TMC3KJ EVM3G


Quality Metal-glazed 3*3mm chip trimmer potentiometer with same performance as original TMC3KJ EVM3G for sale

Metal-glazed 3*3mm chip trimmer potentiometer with same performance as original TMC3KJ EVM3G Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Ningbo Anyo Import & Export Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)